From 22ed60a5ab3b5559f37b97e0c013440a12145122 Mon Sep 17 00:00:00 2001 From: starmen1265 Date: Tue, 17 Mar 2026 23:02:40 +0800 Subject: [PATCH] docs(09-00): complete Wave 0 test scaffolding plan - Added 5 mock fixtures for ZhihuCrawler integration testing - Added 6 test skeletons (marked skip) for Wave 1 implementation - Updated STATE.md with Phase 9 position - Updated ROADMAP.md with plan progress Co-Authored-By: Claude Opus 4.6 --- .planning/STATE.md | 39 +++--- .../09-pipeline-integration/09-00-SUMMARY.md | 111 ++++++++++++++++++ 2 files changed, 131 insertions(+), 19 deletions(-) create mode 100644 .planning/phases/09-pipeline-integration/09-00-SUMMARY.md diff --git a/.planning/STATE.md b/.planning/STATE.md index 3a8366e..5dfa896 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -2,15 +2,15 @@ gsd_state_version: 1.0 milestone: v1.2 milestone_name: Zhihu Crawler -status: completed -stopped_at: Phase 9 context gathered -last_updated: "2026-03-17T14:32:50.433Z" -last_activity: 2026-03-17 — Phase 07 Login Auth complete +status: in_progress +stopped_at: Phase 9 Plan 00 complete +last_updated: "2026-03-17T14:59:13Z" +last_activity: 2026-03-17 — Phase 09-00 Test scaffolding complete progress: total_phases: 9 completed_phases: 8 - total_plans: 24 - completed_plans: 24 + total_plans: 25 + completed_plans: 25 percent: 100 --- @@ -21,16 +21,16 @@ progress: See: .planning/PROJECT.md (updated 2026-03-17) **Core value:** 可靠、可维护的处理管道 - 每个步骤独立、可验证、可恢复 -**Current focus:** v1.2 Zhihu Crawler — Phase 7 执行中 +**Current focus:** v1.2 Zhihu Crawler — Phase 9 执行中 ## Current Position -Phase: 8 of 9 (Crawler - 爬虫核心) -Plan: 01 of 03 -Status: Phase 07 complete, ready for Phase 08 -Last activity: 2026-03-17 — Phase 07 Login Auth complete +Phase: 9 of 9 (Pipeline Integration - 管道整合) +Plan: 01 of 04 +Status: Phase 09-00 Wave 0 complete +Last activity: 2026-03-17 — Phase 09-00 Test scaffolding complete -Progress: [██████████] 100% (v1.2 milestone - Phase 7 complete) +Progress: [██████████] 100% (v1.2 milestone - Phase 9 in progress) ## Performance Metrics @@ -44,9 +44,10 @@ Progress: [██████████] 100% (v1.2 milestone - Phase 7 comple | 07-01 | 15min | 2 | 5 | 2026-03-17 | | 07-02 | 5min | 2 | 4 | 2026-03-17 | | 07-03 | 12min | 3 | 4 | 2026-03-17 | -| Phase 08 P01 | 3min | 2 tasks | 8 files | -| Phase 08-crawler P02 | 5min | 2 tasks | 3 files | -| Phase 08 P03 | 15min | 2 tasks | 5 files | +| Phase 08 P01 | 3min | 2 | 8 | 2026-03-17 | +| Phase 08 P02 | 5min | 2 | 3 | 2026-03-17 | +| Phase 08 P03 | 15min | 2 | 5 | 2026-03-17 | +| 09-00 | 2min | 1 | 1 | 2026-03-17 | ## Accumulated Context @@ -84,8 +85,8 @@ None. ## Session Continuity -Last session: 2026-03-17T14:32:50.432Z -Stopped at: Phase 9 context gathered -Resume file: .planning/phases/09-pipeline-integration/09-CONTEXT.md +Last session: 2026-03-17T14:59:13Z +Stopped at: Phase 9 Plan 00 complete +Resume file: .planning/phases/09-pipeline-integration/09-00-SUMMARY.md -**Next step:** Continue with Phase 08 Crawler +**Next step:** Continue with Phase 09-01 ZhihuAdapter integration diff --git a/.planning/phases/09-pipeline-integration/09-00-SUMMARY.md b/.planning/phases/09-pipeline-integration/09-00-SUMMARY.md new file mode 100644 index 0000000..20c9622 --- /dev/null +++ b/.planning/phases/09-pipeline-integration/09-00-SUMMARY.md @@ -0,0 +1,111 @@ +--- +phase: 09-pipeline-integration +plan: 00 +subsystem: testing +tags: [pytest, mock, fixtures, tdd, zhihu, crawler, pipeline] + +# Dependency graph +requires: + - phase: 08-crawler + provides: ZhihuCrawler with CrawlResult model + - phase: 07-login-auth + provides: ZhihuLogin with ZhihuLoginResult model +provides: + - Test scaffolding for ZhihuAdapter integration with ZhihuCrawler + - Mock fixtures for CrawlResult, CommentsResult, ZhihuLoginResult + - Test skeletons for Wave 1 implementation verification +affects: + - 09-01 (ZhihuAdapter integration) + +# Tech tracking +tech-stack: + added: [] + patterns: + - pytest fixtures for Pydantic model mocking + - pytest.mark.skip for TDD test skeletons + - Wave-based test scaffolding pattern + +key-files: + created: [] + modified: + - tests/test_platforms/test_zhihu.py + +key-decisions: + - "Created 5 mock fixtures (4 required + 1 bonus for error handling)" + - "Test skeletons marked with pytest.mark.skip awaiting implementation" + - "Fixtures use actual Pydantic models from kb_workflow.crawler.models" + +patterns-established: + - "Mock fixtures import Pydantic models inline to avoid circular imports" + - "Test class grouping: TestZhihuAdapterCrawlerIntegration for Wave 1 tests" + - "WAVE_0_COMPLETE marker at file end for scaffolding verification" + +requirements-completed: [] + +# Metrics +duration: 2min +completed: 2026-03-17 +--- + +# Phase 9 Plan 00: Wave 0 Test Scaffolding Summary + +**Created test scaffolding and mock fixtures for ZhihuCrawler integration into ZhihuAdapter** + +## Performance + +- **Duration:** 2 min +- **Started:** 2026-03-17T14:57:01Z +- **Completed:** 2026-03-17T14:59:13Z +- **Tasks:** 1 completed +- **Files modified:** 1 + +## Accomplishments + +- Added 5 mock fixtures for testing ZhihuCrawler integration: + - `mock_crawl_answer_result`: Simulates successful answer crawl with comments + - `mock_crawl_article_result`: Simulates successful zhuanlan article crawl + - `mock_comments_list`: Test data for comment formatting verification + - `mock_zhihu_login_result`: Simulates QR code login success + - `mock_crawl_failed_result`: For cookie expiration error handling tests +- Added 6 test skeletons (marked skip) for Wave 1 implementation: + - `test_fetch_metadata_answer` + - `test_fetch_metadata_article` + - `test_fetch_content_with_comments` + - `test_cookie_expired_triggers_login` + - `test_idempotent_execution` + - `test_comment_formatting` +- pytest successfully collects all 19 tests (13 existing + 6 new skeletons) + +## Task Commits + +Each task was committed atomically: + +1. **Task 0: Create test scaffolding and mock fixtures** - `95218c1` (test) + +## Deviations from Plan + +None - plan executed exactly as written. + +## Issues Encountered + +None. + +## User Setup Required + +None - no external service configuration required. + +## Next Phase Readiness + +- Test scaffolding ready for Wave 1 implementation (09-01) +- Mock fixtures provide CrawlResult, CommentsResult, ZhihuLoginResult models +- Test skeletons define expected behavior for ZhihuAdapter integration + +## Self-Check: PASSED + +- tests/test_platforms/test_zhihu.py: FOUND +- 09-00-SUMMARY.md: FOUND +- Commit 95218c1: FOUND + +--- +*Phase: 09-pipeline-integration* +*Completed: 2026-03-17*