This repository has been archived on 2026-08-07. You can view files and clone it. You cannot open issues or pull requests or push a commit.
Files
kb-skills/.planning/ROADMAP.md
T
starmen1265 b9f74e5a7e docs(11-01): complete stealth fingerprint masking plan
- Created 11-01-SUMMARY.md with execution results
- Updated STATE.md: Plan 1/2 complete, 50% progress
- Updated ROADMAP.md: 11-01 marked complete
- Updated REQUIREMENTS.md: STEALTH-01 to STEALTH-04 complete

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-18 23:50:24 +08:00

4.5 KiB

Roadmap: kb-skills

Milestones

  • ✅ v1.0 Pipeline Architecture - Phases 1-4 (shipped 2026-03-15)
  • ✅ v1.1 Architecture Refactor - Phases 5-6 (shipped 2026-03-16)
  • ✅ v1.2 Zhihu Crawler - Phases 7-9 (shipped 2026-03-17)
  • ✅ v1.3 Proxy Pool - Phase 10 (shipped 2026-03-18)
  • 🚧 v1.4 Zhihu Anti-Crawler - Phase 11 (in progress)

Phases

✅ v1.0 Pipeline Architecture (Phases 1-4) - SHIPPED 2026-03-15

Phase 1: Foundation

Goal: 项目基础设施和状态管理 Plans: 3 plans

Plans:

  • 01-01: WorkflowStateManager 状态管理
  • 01-02: LinkParser URL 解析
  • 01-03: IdempotencyChecker 幂等检查

Phase 2: Adapters

Goal: 平台元数据适配器 Plans: 2 plans

Plans:

  • 02-01: BilibiliAdapter B站适配器
  • 02-02: ZhihuAdapter 知乎适配器

Phase 3: Processors

Goal: 管道处理器架构 Plans: 3 plans

Plans:

  • 03-01: BaseProcessor 基类
  • 03-02: 具体处理器实现
  • 03-03: Schema 验证

Phase 4: Pipeline

Goal: 处理器编排和 CLI Plans: 2 plans

Plans:

  • 04-01: Pipeline 编排引擎
  • 04-02: CLI process 命令
✅ v1.1 Architecture Refactor (Phases 5-6) - SHIPPED 2026-03-16

Phase 5: 归档与目录优化

Goal: 统一中间目录结构,添加自动归档步骤,优化最终目录布局 Plans: 3 plans (all complete)

Phase 6: 代码整合

Goal: 将独立的元数据技能和 Pipeline 模块整合进 kb-workflow Plans: 3 plans (all complete)

✅ v1.2 Zhihu Crawler (Phases 7-9) - SHIPPED 2026-03-17

Phase 7: 登录认证体系

Goal: 建立知乎登录认证机制,支持二维码扫码和手动 Cookie 两种方式 Plans: 3 plans (all complete)

Phase 8: 内容爬取实现

Goal: 实现知乎问答、专栏/文章、评论的完整爬取功能 Plans: 3 plans (all complete)

Phase 9: Pipeline 整合

Goal: 将新爬虫实现整合进现有 Pipeline 架构 Plans: 1 plan (complete)

✅ v1.3 Proxy Pool (Phase 10) - SHIPPED 2026-03-18

Phase 10: Proxy Pool (代理池管理)

Goal: 建立代理池基础设施,支持多代理配置、自动轮换和健康检查 Requirements: PROXY-01, PROXY-02, PROXY-03, PROXY-04 Plans: 2 plans (all complete)

Plans:

  • 10-01: ProxyPool 核心类实现 — 从 YAML/环境变量加载代理,Round-Robin 轮换
  • 10-02: 健康检查与 ZhihuCrawler 集成 — 被动检测、冷却恢复、代理切换

Key Decisions:

  • 使用索引指针而非 itertools.cycle 实现轮换
  • 惰性冷却检查而非后台定时器
  • ProxyPool 参数优先于 config.proxy 配置

🚧 v1.4 Zhihu Anti-Crawler (In Progress)

Milestone Goal: 绕过知乎反爬检测,让 Playwright 爬虫能正常工作

Phase 11: Stealth Fingerprinting (指纹伪装)

Goal: 隐藏 Playwright 自动化特征,让爬虫通过知乎的浏览器指纹检测 Depends on: Phase 10 Requirements: STEALTH-01, STEALTH-02, STEALTH-03, STEALTH-04, VERIFY-01, VERIFY-02 Success Criteria (what must be TRUE):

  1. ZhihuCrawler 访问问答页面时不再被 40362 错误拦截
  2. 爬虫的 navigator.webdriver 属性对知乎不可见
  3. Playwright 特有的 JS 属性(__playwright, pwInspect 等)被移除
  4. 现有功能(登录、Cookie 持久化、内容爬取)保持正常工作 Plans: 2 plans

Plans:

  • 11-01-PLAN.md — 创建 StealthConfig 模块和单元测试
  • 11-02-PLAN.md — 集成 stealth 到 ZhihuCrawler 并验证

Progress

Execution Order: Phases execute in numeric order: 1 → 2 → ... → 10 → 11

Phase Milestone Plans Complete Status Completed
1. Foundation v1.0 3/3 Complete 2026-03-15
2. Adapters v1.0 2/2 Complete 2026-03-15
3. Processors v1.0 3/3 Complete 2026-03-15
4. Pipeline v1.0 2/2 Complete 2026-03-15
5. 归档与目录优化 v1.1 3/3 Complete 2026-03-16
6. 代码整合 v1.1 3/3 Complete 2026-03-16
7. 登录认证体系 v1.2 3/3 Complete 2026-03-17
8. 内容爬取实现 v1.2 3/3 Complete 2026-03-17
9. Pipeline 整合 v1.2 1/1 Complete 2026-03-17
10. Proxy Pool v1.3 2/2 Complete 2026-03-18
11. Stealth Fingerprinting v1.4 1/2 In progress -

Last updated: 2026-03-18