- Add SUMMARY.md with 8 tests (5 unit + 3 integration)
- Update STATE.md: Phase 5 complete, advance to Phase 6
- Mark requirements OUT-01, OUT-02, OUT-03, OUT-04 complete
- Document test patterns and decisions
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Mock _ask_overwrite in all archive tests to avoid stdin issues
Patch get_settings at kb_pipeline.processors.base module level
Document pre-existing test issues in deferred-items.md rather than fix all
AsyncMock for async methods instead of MagicMock
tmp_path fixture for test isolation
patch.object(pipeline, '_ask_rerun_step') for skip_completed tests
OUT-01
OUT-02
OUT-03
OUT-04
6min
2026-03-16
Phase 05 Plan 03: Archive Tests Summary
ArchiveProcessor unit tests (5 tests) and Pipeline integration tests (3 tests) verifying archive directory structure: platform-based organization, no date subdirectories, {YYYYMMDD}_{content_id}_analysis.md filename format
Performance
Duration: 6 min
Started: 2026-03-16T15:22:18Z
Completed: 2026-03-16T15:28:47Z
Tasks: 3
Files modified: 4
Accomplishments
5 ArchiveProcessor unit tests covering: copy to platform dir, filename format, skip completed, detect existing, missing file error
3 Pipeline integration tests verifying: archive step included, platform directory structure, no date subdirectories
Fixed pre-existing test issues blocking verification
Documented deferred pre-existing test issues for future resolution
Task Commits
Each task was committed atomically:
Task 1: Add ArchiveProcessor unit tests - be783f9 (test)
Total deviations: 2 auto-fixed (2 bugs)
Impact on plan: Both auto-fixes were pre-existing test issues that blocked verification. Archive tests themselves executed as planned.
Issues Encountered
Pre-existing bilibili adapter tests have similar AsyncMock issues (6 tests) - documented in deferred-items.md for future resolution
User Setup Required
None - no external service configuration required.
Next Phase Readiness
Archive functionality fully tested
All 10 archive-related tests pass
Phase 05 complete, ready for Phase 06 (code consolidation)