4.8 KiB
gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
| gsd_state_version | milestone | milestone_name | status | stopped_at | last_updated | last_activity | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v1.0 | milestone | executing | Completed 04-03 long command support | 2026-03-11T11:08:35.542Z | 2026-03-11 - Completed 04-02 special command handling |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-03-10)
Core value: 让用户在任何通讯软件中,随时与 AI 代理协作完成软件开发项目 Current focus: Phase 4 - GSD Integration
Current Position
Phase: 4 of 4 (GSD Integration) Plan: 2 of 3 in current phase Status: In Progress Last activity: 2026-03-11 - Completed 04-02 special command handling
Progress: [██████████] 100%
Performance Metrics
Velocity:
- Total plans completed: 12
- Average duration: 5.6 min
- Total execution time: 1.0 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 01-core-infrastructure | 4 | 4 | 6.0 min |
| 02-integration-layer | 3 | 3 | 5.0 min |
| 03-orchestration | 3 | 3 | 5.7 min |
| 04-gsd-integration | 2 | 3 | 7.5 min |
Recent Trend:
- Last 5 plans: 5min, 10min, 7min, 7min, 8min
- Trend: Stable
Updated after each plan completion | Phase 04-gsd-integration P02 | 12 | 3 tasks | 4 files | | Phase 04-gsd-integration P03 | 6 | 3 tasks | 4 files |
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- [Init]: Bridge pattern chosen - no GSD core modifications, all interaction via tmux + slash commands
- [Init]: tmux for session management - keeps Claude CLI persistent context
- [Init]: Dynamic workspace - supports multi-project isolation
- [01-01]: Atomic writes via tempfile.mkstemp + os.replace for crash-safe persistence
- [01-01]: Single backup rotation (state.json.bak) rather than history
- [01-03]: Mock-based testing for tmux integration (no real tmux server required)
- [01-03]: Timestamp suffix format -YYYYMMDD-HHMMSS for collision resolution
- [Phase 01-core-infrastructure]: Argparse for CLI - standard library, no dependencies
- [Phase 01-core-infrastructure]: TmuxSessionError exception class for session-specific errors
- [Phase 01-core-infrastructure]: Exit code 1 for all CLI errors - simple error handling
- [02-03]: {{variable}} syntax for prompt templates - user decision from CONTEXT.md
- [02-03]: Simple string.replace() for template substitution - no Jinja2 dependency
- [02-01]: SKILL.md uses only /gsd:* command triggers, no natural language - user decision from CONTEXT.md
- [02-02]: Three-zone card structure: header + elements + actions
- [02-02]: Error cards use red theme, success cards use green theme
- [02-02]: Pagination uses [N/M] format at message end
- [02-02]: Use lark_md tag for markdown content (Feishu built-in support)
- [Phase 03-orchestration]: 60 second default timeout for command execution (from CONTEXT.md user decision)
- [Phase 03-orchestration]: 3 consecutive polls with same output hash for stabilization detection
- [Phase 03-orchestration]: Word-boundary regex for ASCII error keywords, simple substring for Chinese
- [Phase 03-02]: No timeout limit for approvals - wait for user response or session end
- [Phase 03-02]: 60 second default interval for progress updates (from CONTEXT.md)
- [Phase 03-02]: Fraction pattern allows content after fraction (e.g., [3/5 tasks])
- [Phase 03-03]: Command parsing uses regex r'^/gsd:(\S+)\s*(.)$' for /gsd: pattern extraction
- [Phase 03-03]: Auto-create sessions when no session exists (per CONTEXT.md decision)
- [Phase 03-03]: Output truncated to 2000 chars for Feishu card limits
- [Phase 03-03]: Error handling wraps all operations, returning format_error() cards on exceptions
- [04-01]: User context stored in ~/gsd-workspaces/.users/{user_id}/context.json (per CONTEXT.md)
- [04-01]: Max 5 recent projects maintained in recent_projects list
- [04-01]: Backup fallback for corrupted main file (same pattern as state_manager.py)
- [04-02]: Generic commands prioritize user context over context param for project selection
- [04-02]: Error cards for missing projects include "Create New Project" button with action value
- [04-02]: users_root parameter in Orchestrator for test isolation
- [Phase 04-03]: Long commands detected by command name matching in LONG_COMMANDS set
- [Phase 04-03]: Adaptive timeout: None for long commands, 60 seconds for regular commands
- [Phase 04-03]: new-project callback routes through existing _handle_new_project method
Pending Todos
[From .planning/todos/pending/ - ideas captured during sessions]
None yet.
Blockers/Concerns
[Issues that affect future work]
None yet.
Session Continuity
Last session: 2026-03-11T11:04:12.643Z Stopped at: Completed 04-03 long command support Resume file: None
State initialized: 2026-03-10