phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | requirements-completed | duration | completed | ||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 04-gsd-integration | 02 | orchestration |
|
|
|
|
|
|
|
|
|
8min | 2026-03-11 |
Phase 4 Plan 02: Special Command Handling Summary
Extended Orchestrator with /gsd:new-project and /gsd:use commands, implementing UserContextManager for per-user project tracking and context-based routing
Performance
- Duration: 8 min
- Started: 2026-03-11T10:43:19Z
- Completed: 2026-03-11T10:51:39Z
- Tasks: 3
- Files modified: 4
Accomplishments
- UserContextManager with persistent per-user project tracking
- /gsd:new-project command pre-creates session and updates user context
- /gsd:use command switches project context, shows error with Create button for non-existent projects
- Generic commands now use project from user context first
Task Commits
Each task was committed atomically (TDD pattern with RED -> GREEN commits):
-
Task 1: Add UserContextManager and /gsd:new-project handling
0de7824(test: add failing tests for special command handling)9bd29a2(feat: implement _handle_new_project with UserContextManager)
-
Task 2: Implement /gsd:use command handling with context tracking
8f8d9d6(test: add failing tests for /gsd:use command handling)ffe3200(feat: implement _handle_use_project with context tracking)
-
Task 3: Update handle_message routing to use user context
5af3d1c(feat: use user context for project selection in generic commands)
Plan metadata: (included in task commits)
Note: TDD tasks have multiple commits (test -> feat)
Files Created/Modified
src/gsd_openclaw/user_context.py- Per-user context management with persistence (created by linter enhancement)src/gsd_openclaw/orchestrator.py- Extended with special command handling and user context integrationtests/test_orchestrator.py- Added TestSpecialCommands class with 13 new tests
Decisions Made
- UserContextManager persists to disk using atomic writes (tempfile + os.replace pattern)
- Generic commands prioritize user context over context param for project selection
- Error cards for missing projects include "Create New Project" button with action value
- users_root parameter added to Orchestrator.init for test isolation
Deviations from Plan
Auto-fixed Issues
1. [Rule 3 - Blocking] Added users_root parameter for test isolation
- Found during: Task 3 (user context integration)
- Issue: Integration tests failed because UserContextManager persisted to real ~/gsd-workspaces/.users, causing cross-test contamination
- Fix: Added users_root parameter to Orchestrator.init, updated integration tests to use tmp_users_root fixture
- Files modified: src/gsd_openclaw/orchestrator.py, tests/test_orchestrator.py
- Verification: All 31 tests pass with isolated user contexts
- Committed in: 5af3d1c (Task 3 commit)
2. [Rule 3 - Blocking] Linter expanded UserContextManager with persistence
- Found during: Task 1 (implementation)
- Issue: Initial simple UserContextManager was expanded by linter to include full persistence with UserContext dataclass
- Fix: Adapted Orchestrator to use the expanded interface (UserContextManager now requires user_id in constructor)
- Files modified: src/gsd_openclaw/user_context.py, src/gsd_openclaw/orchestrator.py
- Verification: Tests pass with new interface
- Committed in: 9bd29a2 (Task 1 commit)
Total deviations: 2 auto-fixed (2 blocking) Impact on plan: Both fixes necessary for correct test isolation and using the linter-enhanced module. No scope creep.
Issues Encountered
None - all tasks completed as planned with minor interface adaptations.
User Setup Required
None - no external service configuration required.
Next Phase Readiness
- Special command handling complete, ready for additional GSD command implementations
- User context tracking enables multi-project workflows
- Pattern established for adding new special commands (route in handle_message, implement handle* method)
Self-Check: PASSED
- All files verified to exist
- All commits verified in git history
- All 31 tests passing
Phase: 04-gsd-integration Completed: 2026-03-11