docs(09-00): complete Wave 0 test scaffolding plan
- Added 5 mock fixtures for ZhihuCrawler integration testing - Added 6 test skeletons (marked skip) for Wave 1 implementation - Updated STATE.md with Phase 9 position - Updated ROADMAP.md with plan progress Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -0,0 +1,111 @@
|
||||
---
|
||||
phase: 09-pipeline-integration
|
||||
plan: 00
|
||||
subsystem: testing
|
||||
tags: [pytest, mock, fixtures, tdd, zhihu, crawler, pipeline]
|
||||
|
||||
# Dependency graph
|
||||
requires:
|
||||
- phase: 08-crawler
|
||||
provides: ZhihuCrawler with CrawlResult model
|
||||
- phase: 07-login-auth
|
||||
provides: ZhihuLogin with ZhihuLoginResult model
|
||||
provides:
|
||||
- Test scaffolding for ZhihuAdapter integration with ZhihuCrawler
|
||||
- Mock fixtures for CrawlResult, CommentsResult, ZhihuLoginResult
|
||||
- Test skeletons for Wave 1 implementation verification
|
||||
affects:
|
||||
- 09-01 (ZhihuAdapter integration)
|
||||
|
||||
# Tech tracking
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns:
|
||||
- pytest fixtures for Pydantic model mocking
|
||||
- pytest.mark.skip for TDD test skeletons
|
||||
- Wave-based test scaffolding pattern
|
||||
|
||||
key-files:
|
||||
created: []
|
||||
modified:
|
||||
- tests/test_platforms/test_zhihu.py
|
||||
|
||||
key-decisions:
|
||||
- "Created 5 mock fixtures (4 required + 1 bonus for error handling)"
|
||||
- "Test skeletons marked with pytest.mark.skip awaiting implementation"
|
||||
- "Fixtures use actual Pydantic models from kb_workflow.crawler.models"
|
||||
|
||||
patterns-established:
|
||||
- "Mock fixtures import Pydantic models inline to avoid circular imports"
|
||||
- "Test class grouping: TestZhihuAdapterCrawlerIntegration for Wave 1 tests"
|
||||
- "WAVE_0_COMPLETE marker at file end for scaffolding verification"
|
||||
|
||||
requirements-completed: []
|
||||
|
||||
# Metrics
|
||||
duration: 2min
|
||||
completed: 2026-03-17
|
||||
---
|
||||
|
||||
# Phase 9 Plan 00: Wave 0 Test Scaffolding Summary
|
||||
|
||||
**Created test scaffolding and mock fixtures for ZhihuCrawler integration into ZhihuAdapter**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** 2 min
|
||||
- **Started:** 2026-03-17T14:57:01Z
|
||||
- **Completed:** 2026-03-17T14:59:13Z
|
||||
- **Tasks:** 1 completed
|
||||
- **Files modified:** 1
|
||||
|
||||
## Accomplishments
|
||||
|
||||
- Added 5 mock fixtures for testing ZhihuCrawler integration:
|
||||
- `mock_crawl_answer_result`: Simulates successful answer crawl with comments
|
||||
- `mock_crawl_article_result`: Simulates successful zhuanlan article crawl
|
||||
- `mock_comments_list`: Test data for comment formatting verification
|
||||
- `mock_zhihu_login_result`: Simulates QR code login success
|
||||
- `mock_crawl_failed_result`: For cookie expiration error handling tests
|
||||
- Added 6 test skeletons (marked skip) for Wave 1 implementation:
|
||||
- `test_fetch_metadata_answer`
|
||||
- `test_fetch_metadata_article`
|
||||
- `test_fetch_content_with_comments`
|
||||
- `test_cookie_expired_triggers_login`
|
||||
- `test_idempotent_execution`
|
||||
- `test_comment_formatting`
|
||||
- pytest successfully collects all 19 tests (13 existing + 6 new skeletons)
|
||||
|
||||
## Task Commits
|
||||
|
||||
Each task was committed atomically:
|
||||
|
||||
1. **Task 0: Create test scaffolding and mock fixtures** - `95218c1` (test)
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None - plan executed exactly as written.
|
||||
|
||||
## Issues Encountered
|
||||
|
||||
None.
|
||||
|
||||
## User Setup Required
|
||||
|
||||
None - no external service configuration required.
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
- Test scaffolding ready for Wave 1 implementation (09-01)
|
||||
- Mock fixtures provide CrawlResult, CommentsResult, ZhihuLoginResult models
|
||||
- Test skeletons define expected behavior for ZhihuAdapter integration
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- tests/test_platforms/test_zhihu.py: FOUND
|
||||
- 09-00-SUMMARY.md: FOUND
|
||||
- Commit 95218c1: FOUND
|
||||
|
||||
---
|
||||
*Phase: 09-pipeline-integration*
|
||||
*Completed: 2026-03-17*
|
||||
Reference in New Issue
Block a user